Light enters through a window illuminating their work.
Image shows a UK style home with solar panels on the roof.
An engineer stands beside a heat pump.
The installation of a new renewable energy system is visible.
The heat pump is appropriately sized for the home.
Image of a male technician working on plumbing system indoors.
Technician kneeling on floor focused on boiler installation.
Bright yellow safety vest worn over dark shirt.
Clean and well-lit residential or commercial space serves as backdrop.
Training room for engineers training session.
Group of professionals attending training at a modern facility.
Large screen displaying content.
Individuals working on laptops.
Bright,
well-lit environment with windows.
Image shows solar panels and a heat pump on a UK home.
A homeowner stands beside the correctly sized heat pump.
The renewable energy system is neatly installed.
The heat pump does not block a window or pathway.
Solar panels fit within the roof space.
Close view of feet wearing mini lace socks.
Socks have a delicate lace pattern.
The feet are relaxed on a wooden floor.
Dancing stage setup with colored lights.
Dimensions 40 sqft by 28 sqft.
Features multiple LED lights and atmosphere machines.
Image captures a gas engineer installing a gas boiler in a home.
The engineer interacts with the boiler in a modern and functional setting.
Natural light flows in from the windows creating an inviting atmosphere.
Image shows solar panels installed on a roof and a heat pump next to a UK style home.
An engineer stands beside the heat pump.
The image represents a new renewable energy system installation.
Image shows technician installing solar panels on the roof of a house.
The technician wears a safety helmet and reflective vest.
Skylights are visible and the roof is red.
Trees appear in the background.
A fluffy teddy bear wearing a sweater rides a bicycle through a park.
This image displays a technical detail view of a floor acoustic insulation system.
It features multiple layers,
including a concrete base,
several insulating boards,
and a smooth top layer.
The materials are clearly defined with varying colors indicating different properties.
The isometric perspective helps to visualize the thickness and arrangement of each layer.
This illustration is useful for architects and builders designing acoustic solutions in buildings.
Detailed cross section illustration of a modern condensing gas boiler.
Includes labeled components and piping for clarity.
exhaust systems,
and energy-efficient design.
Passengers are seated in two facing rows inside a modern subway train with overhead handles and wall advertisements.
Image shows a gas engineer installing a Worcester Bosch boiler in a home setting.
The engineer interacts with the boiler.
A functional and modern atmosphere is depicted with natural light from nearby windows.
Male technician works on plumbing at a boiler.
He kneels on the floor adjusting pipes.
Bright yellow safety vest is worn over a dark shirt.
Clean well-lit indoor setting is visible.
Typical residential or commercial building environment seen.
Express train moving swiftly on tracks in bright daylight.
Three people are standing on a bed,
facing a wall,
with bicycles placed in front of them.
The image depicts two construction workers engaged in a pipe repair operation.
They are wearing safety helmets and high-visibility vests,
focused on curing a pipe lining process.
The setting shows a trench where the pipe is laid,
surrounded by urban buildings.
The scene captures the essence of infrastructure maintenance.
Their concentrated expressions highlight the importance of safety and precision in their work.
Illustration shows a horizontal cross-section.
It depicts an old beam grid with a wooden plank floor.
The condition of the beams is good but bent.
Ceramic tiles are illustrated showing a thickness of 8mm.
The drawing includes structural supports and connections clearly marked.
Feet are positioned on a soft carpet.
A teenage boy wears comfortable leggings with rolled cuffs.
An anklet adorns one ankle.
The image captures a casual and relaxed atmosphere.
Illustration of the optimized pipe delivery process shows eight steps.
Start with organizing palletized pipe sections.
Cleaning and chamfering pipes follows.
Prefabricated sections move to installation.
A laser level ensures alignment.
Final step is mechanized backfilling and compaction.