ERROR.CODE 741: GRAVITY ENGINE OUT OF SYNC. ATTEMPTING MANUAL OVERRIDE... FAILED.
ERROR.CODE 510: WARP DRIVE NOT STABILIZED. REBOOTING... REBOOT FAILED.
SYSTEM LOADING: 37.65%
COUNTDOWN TO LAUNCH: UNKNOWN
ESTIMATED RETURN: MID-JANUARY (SUBJECT TO CHANGE).
ERROR.CODE 213: ROUTE DEVIATION DETECTED. AUTO-CORRECTION IN PROGRESS... PROCESS INTERRUPTED.
ERROR.CODE 808: SHIELD MATRIX PARTIALLY OFFLINE. BYPASS ATTEMPT... ERROR.
LOADING STATUS: 52.14%
T- 1 Month, 21 Days, 10 Hours, 32 Minutes, 18 Seconds
SPECULATION REMAINS UNCONFIRMED. TIMEFRAME CRITICAL.
ERROR.CODE 117: COMM SIGNAL DISRUPTED. MANUAL LINK REQUIRED... CONNECTION UNSTABLE.
ERROR.CODE 001: GRAVITY SYSTEM REBOOT REQUIRED. ENGINEERS ENGAGED.
LOADING: 54.99%
CRITICAL FAILURE IMMINENT
>> COMMAND OVERRIDE REQUIRED. SYSTEMS LOCKED.
5... Shield Matrix ACTIVATION FAILED. RETRYING... RETRY SUCCESSFUL.
4... Quantum Core ERROR. REACTIVATING. WARNING: PARTIAL OUTPUT ONLY.
3... ERROR.CODE 808: COMM LINK INTERRUPTED. ROUTING BACKUP CHANNEL... BACKUP ONLINE.
2... PARTICLE SHIELDS DOWN. PROCEEDING WITH LIMITED PROTECTION.
1...
LOADING: 64.83%
WARP DRIVE STUCK IN FEEDBACK LOOP. SYSTEM UNSTABLE.
ERROR.CODE 999: UNAUTHORIZED CORE INTERFERENCE DETECTED. ISOLATING SYSTEMS... UNABLE TO RESOLVE.
SPECULATED LAUNCH DATE: TENTATIVE. SYSTEMS AT RISK OF FAILURE.
AWAITING CONFIRMATION... TARGET LINKON REMAINS OUT OF REACH, Futuristic control room with computers and holographic spaceship. Error codes displayed. Systems monitoring launch. Critical failures and countdown in progress. Engaged engineers working on issues