The lanes are black,
enhancing the futuristic atmosphere.
drawing attention to the unique color palette.
Overall dimensions 12.
20m by 8.
55m and 15.
80m by 8.
55m.
The design includes three bedrooms with bathrooms.
living room,
kitchen with storeroom,
dining hall,
staircase leading upstairs,
and designated car parking.
Include an office building that is 40ft long and 8ft wide.
Include two soccer pitches measuring 60 yards long by 40 yards wide.
Dimensions are 1 to 2 meters in length and 20 to 30 cm in height.
Features themed decorations and obstacles.
Clear representation of layout and design elements.
Dimensions are 12.
20 meters by 8.
55 meters and 15.
80 meters by 8.
55 meters.
The layout includes 3 bedrooms.
Common bathrooms are present.
Long shot of the workspace.
Simple art style with minimal details.
White background and black ink.
It includes tasks with IDs,
durations,
and allocated resources.
It has 2 bedrooms with attached bathrooms.
Includes sit-out area living room kitchen storeroom dining hall staircase to upstairs and car parking space.
The illustration is simple and detailed,
capturing key characteristics of the stack.
Worker in blue overalls painting an orange wall.
Roller brush being used.
Four different house layouts displayed as illustrations.
Layouts labeled Lign 4,
Srijge house,
6 x 8,
and dhd home.
Each layout shows unique room and furniture arrangements.
Includes 2 bedrooms with attached bathrooms,
staircase to upstairs,
The second piece measures 67 cm in height and 106 cm in width,
and corners rounded at 3-4 cm.
The third piece is 61 cm tall,
94 cm wide,
and 5 cm thick,
5-3.
5 cm.
width of 82 cm,
and thickness of 4.
5 cm,
with rounded corners of 2-3 cm.
Lastly,
the smallest piece stands at 49.
5 cm high,
71 cm wide,
and 4 cm thick,
5-2.
The drawing focuses on clarity and precision,
Tasks include event publicity,
volunteer recruitment,
logistics planning,
volunteer training,
event execution,
and post-event activities.
Scribble sketch of carpenters working with wood in an interior design factory.
Poker table features chips and cards.
Soft red and warm lighting from overhead lamps.
Table is surrounded by black leather chairs.
Background includes blurred figures and neon signage.
Eye-level perspective highlights table.
Lettered blocks with stairs are arranged creatively on an orange background.
Place one sand bunker adjacent to the green.
The visual shows the layout clearly from above.
The building features multiple service bays,
including mechanical,
washing,
and detailing areas.
It showcases an open layout that connects multiple rooms on the second floor,
each designed with varying ceiling heights.
Precise measurements and structural components are annotated throughout the plan.
Also,
large windows and doors are marked clearly to indicate the flow of natural light into the space,
Suggested furniture placements are included to emphasize the open connection between indoor spaces and the outside environment.