The lanes are black,
enhancing the futuristic atmosphere.
drawing attention to the unique color palette.
scratch removal,
and polishing services.
VIP waiting area contains luxurious leather seating,
lounge space,
dormitories,
shops,
greenhouses,
and water facilities.
Design includes pathways and green spaces.
Dimensions are 12.
20m by 8.
55m and 15.
80m by 8.
55m.
living room,
dining hall,
staircase to upstairs,
Four distinct house layouts of 6 x 8 squares each.
durations,
and allocated resources.
Includes sit-out area living room kitchen storeroom dining hall staircase to upstairs and car parking space.
Golf course exterior floor plan shown in 2D vector illustration.
High-quality,
modern design.
Detailed layout of clubhouse,
lounge,
pro shop,
and amenities.
Features sand bunkers,
water,
and topographic details.
Highlights spacious,
and water facilities included.
Pathways and green spaces are incorporated.
The image shows an engineering drawing in orthographic views,
third angle projection.
top view,
Key features include circles,
angles,
Four distinct house layouts are illustrated,
each measuring 6 x 8 squares.
Features themed decorations and obstacles.
Tasks include event publicity,
volunteer recruitment,
logistics planning,
volunteer training,
event execution,
and post-event activities.
The building features multiple service bays,
including mechanical,
washing,
and detailing areas.
This image illustrates the optimized pipe delivery process.
An automated station follows that cleans and chamfers pipes.
The final step includes mechanized backfilling and compaction to finish the project.
Black tree design supports numerous baseballs positioned like leaves on branches.
Artistic representation of sports themes.
The second piece measures 67 cm in height and 106 cm in width,
and corners rounded at 3-4 cm.
The third piece is 61 cm tall,
94 cm wide,
and 5 cm thick,
5-3.
5 cm.
width of 82 cm,
and thickness of 4.
5 cm,
Lastly,
the smallest piece stands at 49.
5 cm high,
71 cm wide,
and 4 cm thick,
5-2.
The drawing focuses on clarity and precision,
Plan emphasizes green spaces and has multiple lawns and parking areas.
Roads and paths show connectivity.
Three triangular entrances are present.
Contours indicate changes in terrain.
Each piece has specific dimensions.
Table height is 74 cm,
width is 120 cm,
thickness 6 cm,
rounded corners of 4-5 cm.
Second piece: 67 cm height,
106 cm width,
thickness 5 cm,
3-4 cm corners.
Third piece: 61 cm height,
94 cm width,
5 cm thickness,
2.
5 cm corners.
Fourth piece: 55 cm height,
82 cm width,
4.
2-3 cm corners.
Smallest piece: 49.
5 cm height,
71 cm width,
4 cm thickness,
1.
Central large bubble indicates main living area.
Surrounding smaller bubbles represent bedrooms and other rooms.
Connecting arrows denote relationships between spaces.