It includes tasks with IDs,
durations,
and allocated resources.
Detailed top-down layout of a house in Kerala.
Dimensions are 12.
20m by 8.
55m and 15.
80m by 8.
55m.
It has 2 bedrooms with attached bathrooms.
Includes sit-out area living room kitchen storeroom dining hall staircase to upstairs and car parking space.
The image depicts a person actively engaged in writing on a whiteboard filled with various notes and plans.
It showcases a corporate flow chart,
illustrating interconnected ideas and processes.
The detailed cards and templates highlight a structured approach amidst a vision of chaos.
The background features blurred elements,
resembling fragments of blueprints and cloth banners.
Natural light enhances the clarity of the scene,
A detailed top-down layout of a Kerala house.
Includes 2 bedrooms with attached bathrooms,
a sit-out area,
living room,
kitchen with storeroom,
dining hall,
staircase to upstairs,
and a car parking space.
Document displays proof of payment from PayPal.
Payment sent to BusinessOutstanders email.
Receipt features official PayPal design.
Layout prioritizes clarity with bold elements and a simple background.
Displays total transaction amount of 200 dollars.
Details include date,
time,
and amount in words.
Shows tax,
VAT,
and other fee breakdowns.
Top-down view of an apartment.
Includes bedroom,
lounge,
bathroom,
entrance hall,
kitchen.
Clean and modern design.
The graph illustrates annual operating expenses and administrative expenses clearly.
Overall,
A detailed floor plan of a house showing living room kitchen bedrooms and bathrooms.
Dimensions of rooms labeled clearly.
Includes storage utility area and passage to back.
A detailed flowchart with handwritten notes on a paper,
being pointed to by a hand holding a red marker.
A construction worker in an orange vest holds tools.
Other workers are seen engaged in different activities.
A surreal atmosphere with figures floating and working.
Technical illustration depicts a calender stack resembling those from paper manufacturing.
It shows a tall stack of sheets labeled with letters.
The illustration is simple and detailed,
capturing key characteristics of the stack.
Laptop present.
Hands working on a floor plan with a pencil.
Various materials and color swatches spread out.
Includes wood samples,
fabric samples,
paint color samples.
Scene shows design process considering materials and colors.
Illustration shows architectural drawings.
Top part depicts a preliminary drawing made with blue mechanical pencil showing construction lines.
Bottom part features a final drawing on marker paper in black pencil.
Buildings detailed with depth in windows and doors.
Includes elements like pitched roofs,
sidewalks,
alleys,
and driveways.
Tasks include event publicity,
volunteer recruitment,
logistics planning,
volunteer training,
event execution,
and post-event activities.
Lettered blocks with stairs are arranged creatively on an orange background.
Detailed top-down layout of a traditional Kerala house shown.
Overall dimensions 12.
The design includes three bedrooms with bathrooms.
Incorporates a sit-out area,
staircase leading upstairs,
and designated car parking.
including various important sections.
There are slides dedicated to the team introduction,
challenges faced,
and the added value of the project.
detailed specifications,
a Minimum Viable Product description,
a conclusion summarizing key points,
and future perspectives.
The layout is well-structured and visually appealing,
Logos are incorporated harmoniously throughout the slides.
Create a relationship diagram showing how PLM provides product definitions to ERP and APS.
ERP offers high-level planning,
demand,
and resources to APS.
APS conducts detailed planning and scheduling,
sending results to MES and ERP.
MES executes APS schedules,
providing real-time production data to APS and ERP.
WMS manages inventory,
giving stock information to ERP and APS based on APS plans.
OA system supports administrative processes.
Detailed layout of a 2BHK apartment.
Features two bedrooms,
a kitchen,
a bathroom,
and a living area in a 1000 square meter design.
Several hands are working together on a detailed floor plan,
making notes on a map-like document.
Abstract depiction of a workbench with timber flooring planks.
Tools like a table saw,
hand saw,
measuring tape,
wood glue,
straight edge,
pencil,
mallet,
and clamps are scattered on it.